Your question: What is FF in project management?

Finish-to-finish, also known by the two letter abbreviation of FF, refers to the particular and specific long term and logical relationship exists between one particular schedule activity and another particular schedule activity.

What does FF mean in project?

Finish-to-finish (FF) Indicates that the finish date of the predecessor task determines the finish date of the successor task. For example, if you have rented a lab for editing the scenes, the editing task must be complete when the lab rental ends.

What is finish to finish?

Finish to Finish is a Logical Relationship in which a Successor Activity cannot finish until a Predecessor Activity has finished. PMBOK Guide. In simple words we can say that, the Finish of a Successor Activity is Dependent on Finish of the Predecessor Activity.

What are the four types of dependencies?

There are 4 types of dependencies in project management viz. Mandatory, Discretionary, External, & Internal.

What does start finish project mean?

Based on more theoretical definition, “Start-to-Finish” refers to the relationship between two activities that the completion of successor is dependent on the initiation of its predecessor. So, the successor cannot be finished until the start of the predecessor.

IT IS INTERESTING:  Quick Answer: What is Kanban card system?

What is start to start in project management?

Start to Start is a Logical Relationship in which a Successor Activity cannot start until a Predecessor Activity has started. PMBOK Guide. In simple words we can say that, the Start of a Successor Activity is Dependent on Start of the Predecessor Activity.

How do you identify dependencies?

The dependencies identification and monitoring process consists of 4 simple steps:

  1. Identify and categorize the dependencies involved in your initiative.
  2. Validate the dependencies listed by voting for those that you agree impact your initiative.
  3. Rate the impact of each dependency.

3 окт. 2017 г.

How many types of finishes are there?

Usually, there are two primary types of wood finish, including penetrating and surface finish. Each type results in a unique appearance and protection, making it necessary to choose the right type of finish.

When should you start and end a relationship?

Start-to-Finish relationship is used to schedule the timing of the successor task. i.e when task B should start so that to finish with the start of task A. For example: in this project, critical tasks are design, construction, assemble and deliver.

Why are finishes used?

Finishes are used in the final part of the construction or manufacturing process, forming the final surface of an element. They can protect the element they finish from impact, water, frost, corrosion, abrasion, and so on, and/or they can be decorative.

What is the most common type of dependency between activities?

The most common dependency relationship is a finish-to-start relationship. Task P (predecessor) must be finished before task S (successor) can start. The least common relationship is the start-to-finish relationship.

IT IS INTERESTING:  What is difference between SAFe and agile?

What is dependency in project?

Every project has dependencies, which Max Wideman’s Glossary defines as the “relationships between products or tasks”, i.e. tasks that require input from other tasks to be completed, or activities that can’t start until a previous activity is done. … The scope of a project requires these tasks to be completed in order.

How do you define dependencies?

Definition of dependency

  • dependence sense 1.
  • something that is dependent on something else especially : a territorial unit under the jurisdiction of a nation but not formally annexed by it.
  • a building (such as a stable) that is an adjunct to a main dwelling.

What does SS mean in Microsoft Project?

SS = Scheduled Start of the activity. SF = Scheduled Finish of the activity.

What is float in project schedule?

Put simply, project management float is the amount of time a given task can be delayed without causing a delay in the entire project.

What are the types of dependencies?

There are four standard types of dependencies:

  • Finish to start (FS) A FS B means “activity A must finish before activity B can begin” (or “B can’t start until A has finished”). …
  • Finish to finish (FF) …
  • Start to start (SS). …
  • Start to finish (SF)